Oilenco recently, successfully completed two separate well intervention operations for clients with parted production tubing that were causing access issues for intervention operations.

The first operation was for a client with a tubing break below the subsurface safety valve. On a subsequent operation, Oilenco supported another client with a tubing break located just below the tubing hanger.

Oilenco provided our own Intervention Snake for both clients, however there was some key differences in design features to suit the individual completions.