The strategic benefits of the Oilenco Safety Valve Management Programme were recently demonstrated during a routine well intervention campaign for our client.

The client’s primary objective was to change-out a gas lift valve located within a side pocket mandrel, however the design of the completion required the removal of the 7” Safety Valve to allow access for the wireline kickover tool.

Prior to the operation, Oilenco carried out two full refurbishments of the client’s stock insert safety valves, including the relevant functional test procedures.